CDC 405 Card Reader

Our dear friend Gerard helped us out for two weeks, traveling all the way from the Netherlands to join us. He was able to read several magnetic tapes on our M4 tape drive. Most importantly, he managed to assemble a fully functional unit from our two 405 punch card readers. By combining the two devices, he also made it possible for the 405 to now run at 50 Hz. A big thank you from the whole team for your hard work.

SUN E10000 (e10k) back in action

We’ve reached another milestone—our SUN E10000 (e10k) is up and running again. Not all CPUs are installed yet, as we had a few faulty modules in the system, but we have enough replacement parts on hand.

We’d like to thank Alex, our sysop for the e10k, He worked tirelessly on the system, even going so far as to replace the entire module carrier along with the backplane.

By comparison, our e10k is breathtakingly fast for the year 1997; at full capacity, it achieves approximately 51 gigaflops at 64-bit—which is also what a modern smartphone can do today at 64-bit. Of course, desktop CPUs today are many times faster, operating in the teraflop range, and an Nvidia RTX delivers around 50 teraflops.

We’re looking forward to exciting applications for the e10k, which has found a new home right next to our CRAY Y-MP/EL.

What happened in 2025?

Credit: H. Pedersen/ESO (the full license is at https://www.eso.org/public/copyright)

The Halley Comet is back!
We were able to read a few files from DDS-1..2 cassettes for ESO. Fabio Sogni was looking for a way to retrieve the data from the cassettes. After several attempts failed, he turned to Cray-Cyber and datArena. We had been using a working DDS-3 drive for the Cray YMP-EL in our archive since 2018. Using tools developed by Gerard J van der Grinten, we were able to create TAP files. This allowed us to rescue nearly 2,000 files. One of them is shown in the photo above.

Otherwise:
Unfortunately, we are repeatedly held back by deficiencies in air conditioning technology and buildings.

John and I were able to make progress on the 960, and the Cray YMP-EL is being excellently maintained by our new colleagues and is running wonderfully. The E10K is also making progress and will be back in operation in Q1 2026. Our colleagues were also able to get a PDP-11/40 up and running, along with many other machines.

Unfortunately, we are currently unable to offer online access, but we hope that this will be possible again soon.

I wish you all the best, happy holidays, and a happy start to the new year.

Ralf N.

Update CDC, Cray

Die Cyber 930 Console ist umgebaut auf XT-IDE mit 128MB Disk on Module, die 960 ist vollständig aufgebaut, und hier läuft aktuell die Reparatur. Die 930 hat ein Problem mit ihren Akkus, sowie das 5V Netzteil von CEAG ist defekt und wird überarbeitet. E10k und Cyber 4000 zieht auch in den Betriebsbereich um.

CDC Cyber 180/830 setup

CDC Cyber 180/830 and 67x Tape drives

Now we get ready for install our first „production“ System and 400Hz power supply.

Piller 400Hz power converter

Finally the Cray-Cyber project continues.

We have moved the first computers to our new showroom and storage room.

IBM 705 (UniBw)
Console IBM 705 (UniBw) and CDC Cyber 860 (VCLab)

Many thanks to the UniBw for the active support and endurance.

The Last CDC Cyber 180/960 Mainframes, a 39-year era comes to an end

https://web.archive.org/web/20210629231855/https://santamariatimes.com/news/local/military/vandenberg/the-last-cyber-mainframes-a-39-year-era-comes-to-an-end/article_5ac69350-b95e-5457-8948-8991078b6495.html

The colleagues in Vandenberg (USA) have shut down their 960 forever in June 2021.

I really hope we get our 960 back in service. At the moment it doesn’t look bad, our small data center doesn’t have a suitable power connection. However, the new building is almost finished, only small things are missing.

Cray YMP-EL start up after VCFe 2018

Last year we mainly took care of the CDC 960. It’s time to continue with the small Cray.

IMG_20190525_153105bs_fault_leds_ympel.jpg
Cray YMP-EL fault LEDs
IMG_20190525_151007s_power_distri_ympel
Power for the Cray
IMG_20190525_130219s_cab2_power_ympel
Power connection to cab two
IMG_20190525_145059s_cab1_wire_ympel
IPI wiring cab2 to cab1
IMG_20190525_145049s_cab1_io_connectors_ympel
IO System connectors interchange
IMG_20190525_154204bs_load_ios_ympel
Load IOS
IMG_20190525_154708bs_unicos_up_ympel
Unicos up and running

The Cray is running, I am very happy that there was no bigger problem. Now we can take care of the UNICOS and the network.